What a written quote should contain

Get the quote in writing before you pay a deposit or let work start. This is what the CCPC and the Gardaí say it should set out, and the details a paving job adds.

Checked against the sources on

In short

  • Ask for a quote, which is a fixed price. An estimate can change.
  • The CCPC says to get the price, the completion date, the payment structure and a description of the work in writing.
  • The Gardaí say to ask for an itemised quote showing a phone number, a known address and a VAT number.
  • Get quotes from more than one contractor and compare them line by line.

A quote or an estimate

The two words are used loosely. The CCPC's plainest explanation is in its advice on car repairs: "Make sure you receive a 'quote' (a fixed price) rather than an 'estimate' (a guess at the cost), as estimates can change after the work is done." The same distinction applies to building work. Ask the contractor which one you are being given, and have the word "quote" written on it.

What the CCPC says to get in writing

The Competition and Consumer Protection Commission's advice on hiring a builder or tradesperson says:

"Before paying a deposit or allowing work to begin on your home, make sure you have received clear written details from the builder as to what has been agreed."

It lists four things:

  • "The agreed price"
  • "An estimated completion date"
  • "The payment structure"
  • "A detailed description of the work being carried out."

On why it matters, the CCPC says: "While having a written record will not stop a builder from failing to carry out the work, it does provide you with a paper trail if a problem arises."

What the Gardaí add

The Garda advice on callers offering work is to "ask for an itemised written quotation for the services being offered and the names of persons and locations where they have previously worked successfully". The paperwork "should have a contact telephone number, known address and a V.A.T. registered number". They add: "Be particularly careful where sales documentation only displays mobile contact numbers or in-complete addresses."

Checking a contractor explains how to look those details up.

The details of a paving job

Neither body lists what a paving quote in particular should cover. The items below are our own list. They are the things the price of a driveway or patio depends on, so two quotes can only be compared if both state them.

  • The area in square metres. Measure it yourself as well. The calculators show roughly how much material that area needs.
  • The surface, by product name and colour for slabs or cobblelock, or by thickness for tarmac or concrete.
  • How deep the ground will be dug out, and the material and depth of the sub-base.
  • Edging and kerbs, which are often priced separately.
  • Where rainwater will go. A larger area in a front garden has to be permeable or drain to the ground. See the permeable surface rule.
  • Who removes the soil and rubble.

On the last point, the Department of Climate, Energy and the Environment says: "All waste collectors must hold a valid Waste Collection Permit", and that the permit number must be displayed on the van or lorry. It warns householders: "Ultimately, it is your responsibility as a waste holder to ensure that your waste is disposed of correctly."

The price and VAT

Ask for one total that includes VAT. If the agreement is made at your home, the Consumer Rights Act 2022 requires the trader to give you "the total price" of the service "inclusive of taxes" before you are bound by it. A price given as "plus VAT" is not a total.

Deposits and payments

The CCPC's advice on paying:

  • "Deposits are common in the home improvement sector, especially where materials need to be ordered. But you should be cautious about paying large sums up front."
  • "Avoid paying the full cost before work is completed"
  • "Use a payment method that provides a record of the transaction, such as a debit card if possible."

The CCPC does not give a figure for how large a deposit should be. The Gardaí are blunter about cash: "Never engage a person who insists on cash payment for services offered."

Compare more than one

The CCPC's advice is: "Secure written quotes from multiple contractors". Two of the warning signs it lists for a tradesperson are:

  • "Being considerably cheaper than other tradespeople offering the same services"
  • "Aggressive sales tactics, such as being pressured into making quick decisions"

A quote far below the others is a reason to ask what has been left out.

Checklist to print

Tick each item off against the quote before you agree to it.

  • The business name, a full address, a phone number and the VAT number if the business has one
  • Your name and the address where the work is to be done
  • The area to be paved, in square metres
  • The surface: the product and colour for paving, or the thickness for tarmac or concrete
  • What is being dug out, and how deep
  • The sub-base: the material and its depth
  • Edging and kerbs
  • Where rainwater will go
  • Who takes away the soil and rubble, and their waste collection permit number
  • The total price including VAT
  • The deposit, if there is one, and when each later payment falls due
  • The start date and the expected finish date
  • Any guarantee, and what it covers

When you have a quote you are happy with, the job agreement puts the same details on one page for you both to sign.

Sources

This page is general information and is not legal advice. If a crime is in progress, ring 999 or 112.

Related pages

  • Rogue tradersHow the doorstep tarmac scam works and what Gardaí advise.
  • Checking a contractorHow to look up a VAT number, a company and a business name, and what each check tells you.
  • Job agreement to printA one-page written agreement for a paving job that you and the contractor can fill in and sign.
  • If you have been caughtWho to contact and in what order if you have paid a rogue trader or work has been left unfinished.